Welcome to the definitive guide for the Sunsynk Super Hybrid Parity Inverter. Whether you're a seasoned installer or a technically-minded homeowner, this comprehensive blog post will give you a clear understanding of how to install, program, and master this remarkable piece of technology.
Chapter 1: Understanding the Hybrid Inverter
The word ‘hybrid’ implies a mix of technologies. A hybrid inverter is an intelligent device that manages power from multiple sources simultaneously: solar panels (DC), batteries (DC), and the national grid (AC).
The Sunsynk inverter takes this a step further by charging batteries from both solar and the grid. This allows for clever strategies, like storing cheap off-peak grid power at night for use during expensive peak hours.
Many so-called hybrid inverters require the entire power of the house to pass through them. If your home has a peak demand of 20kW, you need a massive 20kW inverter. Furthermore, their AC charging circuits are often weak, meaning it takes a very long time to charge batteries from the grid.
Sunsynk inverters are Bi-Directional Driver Hybrid Inverters. Their main advantage is reversing power flow to charge batteries from the grid at very high power. They use robust Insulated-Gate Bipolar Transistors (IGBTs), making them far more resilient to power surges than standard inverters.
Chapter 2: The Heart of the Sunsynk Inverter
The Sunsynk Parity Inverter's "GRID" connection is both an input and an output. This is a crucial concept to grasp.
Critical Misconception: The 'GRID' port is not just for input, and 'LOAD' is not the only output. The 'LOAD' connection is a dedicated Uninterruptible Power Supply (UPS) output for essential circuits.
- With Batteries: Essential loads (lights, routers) go to 'LOAD'. Non-essential loads (geysers, AC units) go to 'GRID'.
- Without Batteries: All loads must connect to the 'GRID' port. Do not use the 'LOAD' port.
On the display, the bar chart icon reveals a real-time power flow diagram—an invaluable diagnostic tool.
- Solar Generation: Power flows from solar panels to the Maximum Power Point Trackers (MPPTs).
- Prioritization: You can program the inverter to prioritize this power for either charging batteries or powering the load. If it draws from the grid on a sunny day, it's likely prioritizing battery charging.
- Distribution: The inverter intelligently manages power between all sources and destinations.
Chapter 3: Step-by-Step Installation Guide
Installation should only be performed by a licensed electrical engineer.
- Location: Choose a cool, dry, and well-ventilated location. Avoid high heat or humidity.
- Spacing: If installing multiple inverters, keep them at least a meter apart for ventilation.
- Cabling: Run AC and DC cables in separate trunking.
Safety First: Reversing battery polarity will destroy the inverter and void your warranty. Use a DC fuse and isolator.
The C-rating determines safe charge/discharge current. Exceeding it is dangerous. As a guide:
- AGM: Safe C-rating is ~0.1 (e.g., a 200Ah bank can handle 20A).
- Lithium: Safe C-rating is ~0.35.
For lithium batteries, a communication cable between the battery's BMS and the inverter is essential for accurate State of Charge (SOC) and parameter control. After connecting, check the 'Li BMS' screen to confirm communication is active.
The Current Transformer (CT) coil prevents exporting excess solar power to the grid.
- Placement: Clamp the CT coil around the main live cable after the utility meter but before any loads.
- Direction: An arrow on the coil must point in the direction of grid current flow (into the property).
- Connection: Connect the wires (white+, black-) to the CT terminals in the inverter.
WARNING: VOLTAGE KILLS! The open-circuit voltage (Voc) of your solar array must NEVER exceed the inverter's maximum PV input voltage (typically 450V). This will void your warranty. Voc increases in cold weather.
- When using multiple strings on one MPPT, they must be identical.
- You can use different panel types on each of the two independent MPPTs.
Chapter 4: Mastering Programming
The Sunsynk display is intuitive. Below are the key screens you will use for programming and monitoring.
Your main dashboard showing a real-time overview, daily totals, battery SOC, and power flow from all sources.
A detailed breakdown of voltages, currents, and power for Solar, Grid, Inverter, Load, and Battery.
A live animated diagram showing exactly where power is coming from and going to. An indispensable diagnostic tool.
The gateway to all settings, including timers, battery configuration, load management, and advanced parameters.
Use Case: Store cheap off-peak grid electricity at night to use during expensive peak hours.
Setup: In 'System Mode', select 'Use Timer', define 'Charge Time' and 'Discharge Time', and tick 'Zero Export'.
Use Case: Standard grid-tied system with instant battery backup to the 'LOAD' circuit.
Setup: Tick 'Zero Export' and 'Limit Power to Load Only'.
Single Inverter: Connect to 'GEN/AUX' or 'GRID' via a changeover switch.
Multiple Inverters: You must connect the generator to the 'GRID' input. Do not use 'GEN/AUX' to avoid system instability.
Use Case: Divert excess solar energy to non-essential loads like a geyser or pool pump once batteries are full.
Setup: In 'Aux Load' settings, define the battery SOC percentage at which this output turns on and off.
Use Case: Supplement the grid with battery power during high demand to avoid peak usage charges.
Setup: In 'Aux Load' settings, define the grid power threshold at which the inverter will start assisting.
Chapter 5: Advanced Configuration
You can connect up to 16 Sunsynk inverters in parallel for massive single-phase or three-phase systems.
- All inverters must be the same model with identical firmware.
- All batteries must connect to a common busbar.
- Only parallel the 'GRID' and 'LOAD' ports. Never parallel the 'AUX/Gen' input.
- Use short, high-quality communication cables with the master inverter positioned centrally.
- Single-Phase: One 'Master', all others 'Slaves'. One CT coil on the master.
- Three-Phase: Three 'Masters' (one for each phase). Three CT coils required.
- Only the Master inverter communicates with the battery BMS.
Chapter 6: Troubleshooting Fault Codes
Faults are almost always caused by installation issues, not a faulty inverter. Expand each fault code to see details:
The most common parallel fault. Check cables, connections, and master/slave settings. On systems with >3 inverters, check termination resistor dip switches.
Overload on the 'Load' terminal, often from motor inrush current. Move non-essential loads off the 'LOAD' (UPS) circuit.
The battery cannot deliver the required current. Check the battery's C-rating, cable thickness, and connection tightness.
A battery problem. The voltage is collapsing under load, indicating an undersized bank, poor connections, or a faulty BMS.
A dangerous earth fault on the solar array (e.g., a cable touching a metal roof). Isolate the array and test each string.
The inverter is overheating. Clean fans and air ducts, and ensure adequate ventilation.
Follow Our Social Media Platforms:
Common Questions and Popular Searches
Explore Answers To Frequent Questions And Discover Resources For Your Solar Journey:
1kVA Inverter Load Guide
Load guide for small households.
2kVA System Load Capacity
Powering essentials in medium homes.
3kVA System Panel Count
Understand solar array sizing.
3kVA Inverter Load Guide
Appliance guide for a typical household.
Best 3kVA Inverter Brand
Compare reliability and warranties.
3kVA Appliance Load Guide
Understand simultaneous load capacity.
3kVA Powering Motor Loads
Guidance on handling motor loads.
Choosing the Right Inverter
Matching inverters to your specific load.
Match Panels to Inverter
Tips for optimal system performance.
3.5kVA Inverter Load Guide
Explore residential setup capabilities.
Best Solar Panels Zimbabwe
Analysis of performance and durability.
Solar Companies Zimbabwe
Customer service and reliability.
Best Solar Panel Brands
Guide for home and business solutions.
Solar Installers Zimbabwe
Professional and certified installers.
3kVA System Cost Guide
Get pricing information for Zimbabwe.
5kVA System Cost Guide
Budget requirements for systems.
Contact Our Sales Team:
Sona Solar Zimbabwe
Address:
7 Frank Johnson Avenue, Eastlea, Harare, Zimbabwe.
Call/WhatsApp:
Sales:
+263 78 293 3586
Sales:
+263 78 922 2847
Operations:
+263 78 864 2437
Email:
sonasolarzw@gmail.com
Website:
www.sonasolar.co.zw
Borehole Experts Zimbabwe
Address:
7 Frank Johnson Avenue, Eastlea, Harare, Zimbabwe.
Call/WhatsApp:
Sales:
+263 77 389 8979
Sales:
+263 71 500 3777
Operations:
+263 71 918 7878
Email:
boreholeexpertszw@gmail.com
Website:
www.boreholeexperts.co.zw